Installation, Pressurization, and Grouting of Hydraulic Flat Jacks in Morrow Point Powerplant
The 5 phases covered in the hydraulic flat jack program at Morrow Point Powerplant, Colo., are calibration and testing, installation, instrumentation and measurements, pressurization, and grouting. The flat jacks were embedded in the concrete walls on opposite sides of the underground chamber, utilizing the interior walls and floors as load-bearing struts. The jacks were intended to keep the internal concrete structures in contact with the rock excavation in the area of a large shear zone. (Author)
Installation, Pressurization, and Grouting of Hydraulic Flat Jacks in Morrow Point Powerplant
The 5 phases covered in the hydraulic flat jack program at Morrow Point Powerplant, Colo., are calibration and testing, installation, instrumentation and measurements, pressurization, and grouting. The flat jacks were embedded in the concrete walls on opposite sides of the underground chamber, utilizing the interior walls and floors as load-bearing struts. The jacks were intended to keep the internal concrete structures in contact with the rock excavation in the area of a large shear zone. (Author)
Installation, Pressurization, and Grouting of Hydraulic Flat Jacks in Morrow Point Powerplant
M. L. Haverland (author)
1970
54 pages
Report
No indication
English
Morrow point underground powerplant
Engineering Index Backfile | 1965