A platform for research: civil engineering, architecture and urbanism
Measure for measure: Stabilising Welsh mines by injecting 150,000t of grout through 10,000 holes
Measure for measure: Stabilising Welsh mines by injecting 150,000t of grout through 10,000 holes
Measure for measure: Stabilising Welsh mines by injecting 150,000t of grout through 10,000 holes
Ground engineering ; 28
1995
Article (Journal)
Unknown
Measure for measure: Stabilising Welsh mines by injecting 150,000t of grout through 10,000 holes
British Library Online Contents | 1995
Stabilising Combe Down stone mines
British Library Online Contents | 2003
|European Patent Office | 2015
|