Betontechnik und Ausführung im Los Nord der ICE-Neubaustrecke Nürnberg-Ingolstadt, insbesondere der Tunnel Offenbau
The new Inter City Express (ICE) line section Nürnberg-Ingolstadt has a total length of approximately 83 km. In 1998, the consortium 'ARGE ICE - NBS Nürnberg-Ingoldstadt - Los Nord' with technically leadership of the Bilfinger Berger AG received the order for construction of 'Los Nord'. This includes the construction of numerous single building projects, such as roads, rain storage basins and rain seepage reservoirs, drainage lines, retaining walls and noise barriers, railway and road bridges as well as tunnels. For the construction of those projects more than 500,000 m(exp3) fly ash optimized concrete were used, comprising bridges (approx. 10,000 m(exp3)), shotcrete (approx. 70,000 m(exp3)), tunnel linings (approx. 60,000 m(exp3)), bored piled concrete (approx. 100,000 m(exp3)), tunnels with cut and cover method (75,000 m(exp3)), trough structures (approx. 35,000 m(exp3)), elevated trackways (approx. 18,000 m(exp3)) and hydraulic bound base layer for rigid track system (approx. 60,000 m(exp3)). Fly ash concretes were preferred in particular for massive structures or structures which are exposed to high residual stress caused by heat of hydration, such as tunnel linings and walls. Furthermore, the use of fly ash leads to improved properties of the concrete (porosity, chemical resistance, etc).
Betontechnik und Ausführung im Los Nord der ICE-Neubaustrecke Nürnberg-Ingolstadt, insbesondere der Tunnel Offenbau
The new Inter City Express (ICE) line section Nürnberg-Ingolstadt has a total length of approximately 83 km. In 1998, the consortium 'ARGE ICE - NBS Nürnberg-Ingoldstadt - Los Nord' with technically leadership of the Bilfinger Berger AG received the order for construction of 'Los Nord'. This includes the construction of numerous single building projects, such as roads, rain storage basins and rain seepage reservoirs, drainage lines, retaining walls and noise barriers, railway and road bridges as well as tunnels. For the construction of those projects more than 500,000 m(exp3) fly ash optimized concrete were used, comprising bridges (approx. 10,000 m(exp3)), shotcrete (approx. 70,000 m(exp3)), tunnel linings (approx. 60,000 m(exp3)), bored piled concrete (approx. 100,000 m(exp3)), tunnels with cut and cover method (75,000 m(exp3)), trough structures (approx. 35,000 m(exp3)), elevated trackways (approx. 18,000 m(exp3)) and hydraulic bound base layer for rigid track system (approx. 60,000 m(exp3)). Fly ash concretes were preferred in particular for massive structures or structures which are exposed to high residual stress caused by heat of hydration, such as tunnel linings and walls. Furthermore, the use of fly ash leads to improved properties of the concrete (porosity, chemical resistance, etc).
Betontechnik und Ausführung im Los Nord der ICE-Neubaustrecke Nürnberg-Ingolstadt, insbesondere der Tunnel Offenbau
Concrete Technology and Execution of "Los Nord" of the New ICE Line Section Nürnberg-Ingolstadt, especially Tunnel Offenbau"
Wagner, Jörg-Pete (author) / Willmes, Michael (author)
VGB PowerTech ; 85 ; 60-64
2005
5 Seiten, 16 Bilder, 6 Tabellen
Article (Journal)
German
Beton , Eisenbahn , Flugasche , Tiefbau , Zuschlagstoff
ICE-Neubaustrecke Nürnberg-Ingolstadt Baulos "Audi-Tunnel Nord"
IuD Bahn | 2001
|Neubaustrecke Nürnberg-Ingolstadt in Betrieb
Online Contents | 2006
Notausgang am Tunnel Euerwang der ICE-Neubaustrecke Nürnberg-Ingolstadt
IuD Bahn | 2004
|Notausgang am Tunnel Euerwang der ICE-Neubaustrecke Nürnberg-Ingolstadt
Tema Archive | 2004
|Feste Fahrbahn für die Neubaustrecke Nürnberg-Ingolstadt
Tema Archive | 2005