A platform for research: civil engineering, architecture and urbanism
For the purpose of foundation and structure stability during the construction of tide embankment, three monitoring projects including embankment settlement monitoring, berm platform settlement monitoring and pore water pressure monitoring are installed. Integrated monitoring data shows that foundation appears oversize instantaneous settlement on account of high construction speed, short loading interval at initial stage. Following with the shaping of embankment, stable monitoring data range, slow change rate and high dissipation speed of pore water pressure come along. Based on actual embankment settlement data, consolidation degree of soil mass is high and foundation stability becomes strong by means of hyperbolic curve.
For the purpose of foundation and structure stability during the construction of tide embankment, three monitoring projects including embankment settlement monitoring, berm platform settlement monitoring and pore water pressure monitoring are installed. Integrated monitoring data shows that foundation appears oversize instantaneous settlement on account of high construction speed, short loading interval at initial stage. Following with the shaping of embankment, stable monitoring data range, slow change rate and high dissipation speed of pore water pressure come along. Based on actual embankment settlement data, consolidation degree of soil mass is high and foundation stability becomes strong by means of hyperbolic curve.
Monitoring of Inland Tide Embankment of Binzhou Port
Advanced Materials Research ; 1065-1069 ; 499-502
2014-12-11
4 pages
Article (Journal)
Electronic Resource
English
Monitoring of Inland Tide Embankment of Binzhou Port
British Library Conference Proceedings | 2015
|TIDE EMBANKMENT PANEL, TIDE EMBANKMENT AND CONSTRUCTION METHOD OF TIDE EMBANKMENT
European Patent Office | 2018
|