A platform for research: civil engineering, architecture and urbanism
A landmark building is located in yuzhong zone , Chongqing . That there is 5 floors in the underground, 58 floors on the ground.And the total height is 272.4 meters. Combined with practical engineering focuses ,this paper introduces the steel tube-reinforced concrete column construction quality control points and difficulties.
A landmark building is located in yuzhong zone , Chongqing . That there is 5 floors in the underground, 58 floors on the ground.And the total height is 272.4 meters. Combined with practical engineering focuses ,this paper introduces the steel tube-reinforced concrete column construction quality control points and difficulties.
On Steel Pipe Concrete Composite Column Construction
Applied Mechanics and Materials ; 321-324 ; 259-263
2013-06-13
5 pages
Article (Journal)
Electronic Resource
English
Anchoring assembly, steel pipe concrete column and construction method of steel pipe concrete column
European Patent Office | 2024
|Construction method of outer wrapped concrete steel pipe composite column
European Patent Office | 2015
|European Patent Office | 2019
|CONSTRUCTION METHOD FOR STEEL PIPE COLUMN MEMBER AND CONCRETE FILLING STEEL PIPE COLUMN
European Patent Office | 2018
|Reinforced concrete steel pipe column construction method
European Patent Office | 2015
|