Hydroshield drive H3‐4 in the lower Inn valley – construction experienceHydroschildvortrieb H3‐4 im Unterinntal – Erfahrungen der Bauausführung
In the lower Inn valley in the Tyrol, the existing railway line is being widened to four tracks as part of the TEN (Trans European Network) section Munich‐Verona. The Brenner Railway Company has appointed the joint venture Porr Tunnelbau – Max Bögl for the construction of the section H3‐4. At the time of writing the article, two thirds of the 5.8 km long tunnelled section had been bored, with daily advance rates of up to 32 m being achieved. A Hydroshield is being used to bore the main tunnel with a diameter of 13.03 m. The tunnel gradient lies completely under the groundwater table. For long stretches, the tunnel route runs through loose sandy or gravelly soil with high and very changeable permeability. At the borders of the contract section, silty clay soil dominates.
Eleven shafts are being constructed every 500 m along the tunnel route to act as emergency exits. The shafts are constructed with diaphragm walls and are connected to the main tunnel by pipe‐jacked headings of 4.8 m diameter. Because of the groundwater pressure of about 3 bar throughout the site, a sealing block has to be constructed in advance at the junction area.
Im Tiroler Unterinntal wird die bestehende Bahntrasse im Rahmen des TEN‐Abschnitts München‐Verona viergleisig ausgebaut. Die Brenner Eisenbahn Gesellschaft hat die Arbeitsgemeinschaft Porr Tunnelbau – Max Bögl mit der Errichtung des Streckenabschnitts H3‐4 beauftragt. Zum Zeitpunkt der Erstellung des Beitrags waren bereits rund zwei Drittel der 5,8 m langen Vortriebsstrecke aufgefahren, wobei Tagesleistungen bis zu 32 m erreicht wurden. Zum Auffahren des Haupttunnels mit einem Ausbruchdurchmesser von 13,03 m wird ein Hydroschild eingesetzt. Die Tunnelgradiente liegt vollständig unter Grundwasserniveau. Über weite Strecken verläuft die Tunneltrasse in sandigen oder kiesigen Lockerböden mit hoher und stark wechselnden Durchlässigkeiten. An den Baulosgrenzen dominieren schluffig‐tonige Bodenanteile.
Entlang der Tunnelstrecke werden im Abstand von je 500 m elf Schachtbauwerke als Notausgänge hergestellt. Die in Schlitzwandbauweise erstellten Schächte werden über Rohrvortriebe mit einem Durchmesser von 4,8 m an den Haupttunnel herangeführt. Aufgrund des überall anstehenden Grundwasserdrucks von etwa 3 bar muss im Anschlussbereich vorab ein Dichtblock hergestellt werden.
Hydroshield drive H3‐4 in the lower Inn valley – construction experienceHydroschildvortrieb H3‐4 im Unterinntal – Erfahrungen der Bauausführung
In the lower Inn valley in the Tyrol, the existing railway line is being widened to four tracks as part of the TEN (Trans European Network) section Munich‐Verona. The Brenner Railway Company has appointed the joint venture Porr Tunnelbau – Max Bögl for the construction of the section H3‐4. At the time of writing the article, two thirds of the 5.8 km long tunnelled section had been bored, with daily advance rates of up to 32 m being achieved. A Hydroshield is being used to bore the main tunnel with a diameter of 13.03 m. The tunnel gradient lies completely under the groundwater table. For long stretches, the tunnel route runs through loose sandy or gravelly soil with high and very changeable permeability. At the borders of the contract section, silty clay soil dominates.
Eleven shafts are being constructed every 500 m along the tunnel route to act as emergency exits. The shafts are constructed with diaphragm walls and are connected to the main tunnel by pipe‐jacked headings of 4.8 m diameter. Because of the groundwater pressure of about 3 bar throughout the site, a sealing block has to be constructed in advance at the junction area.
Im Tiroler Unterinntal wird die bestehende Bahntrasse im Rahmen des TEN‐Abschnitts München‐Verona viergleisig ausgebaut. Die Brenner Eisenbahn Gesellschaft hat die Arbeitsgemeinschaft Porr Tunnelbau – Max Bögl mit der Errichtung des Streckenabschnitts H3‐4 beauftragt. Zum Zeitpunkt der Erstellung des Beitrags waren bereits rund zwei Drittel der 5,8 m langen Vortriebsstrecke aufgefahren, wobei Tagesleistungen bis zu 32 m erreicht wurden. Zum Auffahren des Haupttunnels mit einem Ausbruchdurchmesser von 13,03 m wird ein Hydroschild eingesetzt. Die Tunnelgradiente liegt vollständig unter Grundwasserniveau. Über weite Strecken verläuft die Tunneltrasse in sandigen oder kiesigen Lockerböden mit hoher und stark wechselnden Durchlässigkeiten. An den Baulosgrenzen dominieren schluffig‐tonige Bodenanteile.
Entlang der Tunnelstrecke werden im Abstand von je 500 m elf Schachtbauwerke als Notausgänge hergestellt. Die in Schlitzwandbauweise erstellten Schächte werden über Rohrvortriebe mit einem Durchmesser von 4,8 m an den Haupttunnel herangeführt. Aufgrund des überall anstehenden Grundwasserdrucks von etwa 3 bar muss im Anschlussbereich vorab ein Dichtblock hergestellt werden.
Hydroshield drive H3‐4 in the lower Inn valley – construction experienceHydroschildvortrieb H3‐4 im Unterinntal – Erfahrungen der Bauausführung
Göbl, Arthur (author)
Geomechanics and Tunnelling ; 2 ; 61-72
2009-02-01
12 pages
Article (Journal)
Electronic Resource
English
Hydroshield drive H3-4 in the Lower Inn valley - construction experience
Tema Archive | 2009
|Planung und Bauausführung für den Eisenbahntunnel Brixlegg im Tiroler Unterinntal
Tema Archive | 2007
|Erfahrungen zur Baukoordination im Untertagebau im Unterinntal
Tema Archive | 2010
|Bauausführung Betuweroute: Erfahrungen beim Schildvortrieb
Tema Archive | 2001
|