Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Steel strand pressing and penetrating device of prestressed flat anchor
The invention relates to a steel strand pressing and penetrating device of a prestressed flat anchor, which comprises a traction head and a steel strand fixer, the rear end of the traction head is connected with a clamping piece pressing base, the steel strand fixer is positioned in the traction head, a clamping piece is arranged in the steel strand fixer, and a steel strand penetrates through the clamping piece. A plurality of inverted-cone-shaped holes are formed in the steel strand fixing device, and each inverted-cone-shaped hole is internally provided with one clamping piece. A plurality of wire passing holes are formed in the clamping piece pressing base; a circular limiting groove is formed in the side, close to the traction head, of the clamping piece pressing base. The clamping piece is formed by combining two wedge-shaped clamping pieces. The locking device aims at overall strand pulling of the prestressed flat anchor, and the locking problem in the strand pulling process is solved.
本发明涉及一种预应力扁锚的钢绞线压紧穿束装置,包括牵引头和钢绞线固定器,所述牵引头后端连接有夹片压紧底座,所述钢绞线固定器位于所述牵引头内部,所述钢绞线固定器内设置有夹片,所述夹片内穿过有钢绞线。所述钢绞线固定器上开设若干倒锥形孔,各所述倒锥形孔内各设置有一个所述夹片。所述夹片压紧底座上开设有若干过线孔;所述夹片压紧底座靠近所述牵引头的一侧开设有圆形限位槽。所述夹片为两片式楔形夹片组合而成。本发明针对预应力扁锚的整体穿束,解决穿束过程中的锁定难题。
Steel strand pressing and penetrating device of prestressed flat anchor
The invention relates to a steel strand pressing and penetrating device of a prestressed flat anchor, which comprises a traction head and a steel strand fixer, the rear end of the traction head is connected with a clamping piece pressing base, the steel strand fixer is positioned in the traction head, a clamping piece is arranged in the steel strand fixer, and a steel strand penetrates through the clamping piece. A plurality of inverted-cone-shaped holes are formed in the steel strand fixing device, and each inverted-cone-shaped hole is internally provided with one clamping piece. A plurality of wire passing holes are formed in the clamping piece pressing base; a circular limiting groove is formed in the side, close to the traction head, of the clamping piece pressing base. The clamping piece is formed by combining two wedge-shaped clamping pieces. The locking device aims at overall strand pulling of the prestressed flat anchor, and the locking problem in the strand pulling process is solved.
本发明涉及一种预应力扁锚的钢绞线压紧穿束装置,包括牵引头和钢绞线固定器,所述牵引头后端连接有夹片压紧底座,所述钢绞线固定器位于所述牵引头内部,所述钢绞线固定器内设置有夹片,所述夹片内穿过有钢绞线。所述钢绞线固定器上开设若干倒锥形孔,各所述倒锥形孔内各设置有一个所述夹片。所述夹片压紧底座上开设有若干过线孔;所述夹片压紧底座靠近所述牵引头的一侧开设有圆形限位槽。所述夹片为两片式楔形夹片组合而成。本发明针对预应力扁锚的整体穿束,解决穿束过程中的锁定难题。
Steel strand pressing and penetrating device of prestressed flat anchor
一种预应力扁锚的钢绞线压紧穿束装置
WANG YANJUN (Autor:in) / YU ZHONGMING (Autor:in) / ZOU WEIPING (Autor:in) / ZHANG CHAO (Autor:in) / DAI ZHENGWEI (Autor:in) / NI HAO (Autor:in) / SHAO YIFAN (Autor:in) / ZHANG KE (Autor:in)
26.05.2023
Patent
Elektronische Ressource
Chinesisch
Prestressed steel strand bundle penetrating device and method
Europäisches Patentamt | 2023
|Prestressed steel strand combing and penetrating traction head
Europäisches Patentamt | 2016
|Prestressed steel strand anchor rod and construction method thereof
Europäisches Patentamt | 2022
|Pressing and conveying device for whole prestressed steel strand of bridge
Europäisches Patentamt | 2021
|Novel prestressed steel strand releasing anchor withdrawing device and using method thereof
Europäisches Patentamt | 2023
|