Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Ship group lockage formation connecting device and method thereof
The ship group lockage formation connecting device mainly comprises an electric working ship, pushing mechanical arms are arranged on the bow of the electric working ship, the pushing mechanical arms are distributed left and right, every two pushing mechanical arms form a group, and the pushing mechanical arms push the sterns of the ships in the front row; anti-collision buffer devices are arranged at the stern of the electric working ship, are distributed left and right and are used for buffering the prows of the ships in the back row; the bow and the stern of the electric working ship are additionally provided with a plurality of sets of electric cable tightening winches, and the electric cable tightening winches are connected with the ships in the front row and the rear row in a binding mode. According to the ship group lockage formation connecting device and method, the operation cost of a ship party can be saved, and the ship lock passing capacity is improved.
一种船舶成组过闸编队连接装置及其方法,主要包括电动工作船,电动工作船船首布置有顶推机械臂,顶推机械臂左右分布并两两为一组,顶推机械臂对前排船舶船尾顶推;电动工作船船尾布置有防撞缓冲装置,防撞缓冲装置左右分布,防撞缓冲装置对后排船舶船首缓冲;所述电动工作船船首和船尾另外布置有多组电动紧缆绞车,电动紧缆绞车与前后排的船舶捆绑连接。本发明提供的一种船舶成组过闸编队连接装置及其方法,可节省船方运营成本,提高了船闸通过能力。
Ship group lockage formation connecting device and method thereof
The ship group lockage formation connecting device mainly comprises an electric working ship, pushing mechanical arms are arranged on the bow of the electric working ship, the pushing mechanical arms are distributed left and right, every two pushing mechanical arms form a group, and the pushing mechanical arms push the sterns of the ships in the front row; anti-collision buffer devices are arranged at the stern of the electric working ship, are distributed left and right and are used for buffering the prows of the ships in the back row; the bow and the stern of the electric working ship are additionally provided with a plurality of sets of electric cable tightening winches, and the electric cable tightening winches are connected with the ships in the front row and the rear row in a binding mode. According to the ship group lockage formation connecting device and method, the operation cost of a ship party can be saved, and the ship lock passing capacity is improved.
一种船舶成组过闸编队连接装置及其方法,主要包括电动工作船,电动工作船船首布置有顶推机械臂,顶推机械臂左右分布并两两为一组,顶推机械臂对前排船舶船尾顶推;电动工作船船尾布置有防撞缓冲装置,防撞缓冲装置左右分布,防撞缓冲装置对后排船舶船首缓冲;所述电动工作船船首和船尾另外布置有多组电动紧缆绞车,电动紧缆绞车与前后排的船舶捆绑连接。本发明提供的一种船舶成组过闸编队连接装置及其方法,可节省船方运营成本,提高了船闸通过能力。
Ship group lockage formation connecting device and method thereof
一种船舶成组过闸编队连接装置及其方法
QI JUNLIN (Autor:in) / LIU GUANGYAO (Autor:in) / ZHENG WEILI (Autor:in) / YAN XIAOQING (Autor:in) / JIN FENG (Autor:in) / WANG XIANGDONG (Autor:in) / WANG ZHIBIN (Autor:in) / KANG JIANJUN (Autor:in) / HWANG JUNG-HAN (Autor:in) / LI LEILEI (Autor:in)
05.04.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02C
SHIP-LIFTING DEVICES OR MECHANISMS
,
Schiffshebevorrichtungen
Ship lockage traction device, buffering device and lockage stabilizing method
Europäisches Patentamt | 2023
|Non-self-propelled ship group lockage method and auxiliary system thereof
Europäisches Patentamt | 2024
|