Construction method fir smooth surface of exposed part of slab-pile wall
The invention provides a construction method for a smooth surface of an exposed part of a slab-pile wall, and belongs to the technical field of building construction. The construction method for the smooth surface of the exposed part of the slab-pile wall comprises the following steps of Step 1, excavating a pile body; Step 2, leveling an inner wall by mortar; Step 3, filling installation foam; Step 4, installing a bamboo plywood inner mold; Step 5, pouring concrete; Step 6, breaking a protection wall, a bamboo plywood and the foam; and Step 7, installing a pile plate. The construction methodfor the smooth surface of the exposed part of the slab-pile wall obtained by using the design has the advantages that in the use process, earthwork in a position of a baffle plate is excavated in advance, and the foam is filled before the internal arrangement of the bamboo plywood, so that the later breaking strength is reduced, the construction effect is improved, and the protection on a finishedproduct is enhanced; and the inner side of the protection wall is leveled through the mortar, and the bamboo plywood is internally arranged, so that the flatness and the appearance quality of a slide-resistant pile of the exposed part are improved.
本发明提供了一种桩板墙外露部分光面的施工方法,属于建筑施工技术领域。该一种桩板墙外露部分光面的施工方法,包括如下步骤:S1:桩体开挖;S2:内壁砂浆找平;S3:安装泡沫填充;S4:安装竹胶板内模;S5:混凝土浇筑;S6:破除护壁、竹胶板和泡沫;S7:安装桩板。本发明通过上述设计得到的一种桩板墙外露部分光面的施工方法,使用时,通过提前开挖挡板位置的土石方,内装竹胶板前填塞泡沫,减少后期破除的强度,提高施工功效,加强对成品的保护;通过护壁内测砂浆找平,内装竹胶板,提高外露部分抗滑桩的平整度和外观质量。
Construction method fir smooth surface of exposed part of slab-pile wall
The invention provides a construction method for a smooth surface of an exposed part of a slab-pile wall, and belongs to the technical field of building construction. The construction method for the smooth surface of the exposed part of the slab-pile wall comprises the following steps of Step 1, excavating a pile body; Step 2, leveling an inner wall by mortar; Step 3, filling installation foam; Step 4, installing a bamboo plywood inner mold; Step 5, pouring concrete; Step 6, breaking a protection wall, a bamboo plywood and the foam; and Step 7, installing a pile plate. The construction methodfor the smooth surface of the exposed part of the slab-pile wall obtained by using the design has the advantages that in the use process, earthwork in a position of a baffle plate is excavated in advance, and the foam is filled before the internal arrangement of the bamboo plywood, so that the later breaking strength is reduced, the construction effect is improved, and the protection on a finishedproduct is enhanced; and the inner side of the protection wall is leveled through the mortar, and the bamboo plywood is internally arranged, so that the flatness and the appearance quality of a slide-resistant pile of the exposed part are improved.
本发明提供了一种桩板墙外露部分光面的施工方法,属于建筑施工技术领域。该一种桩板墙外露部分光面的施工方法,包括如下步骤:S1:桩体开挖;S2:内壁砂浆找平;S3:安装泡沫填充;S4:安装竹胶板内模;S5:混凝土浇筑;S6:破除护壁、竹胶板和泡沫;S7:安装桩板。本发明通过上述设计得到的一种桩板墙外露部分光面的施工方法,使用时,通过提前开挖挡板位置的土石方,内装竹胶板前填塞泡沫,减少后期破除的强度,提高施工功效,加强对成品的保护;通过护壁内测砂浆找平,内装竹胶板,提高外露部分抗滑桩的平整度和外观质量。
Construction method fir smooth surface of exposed part of slab-pile wall
一种桩板墙外露部分光面的施工方法
ZHAO MENGHE (author) / LU JIA'EN (author) / LU GUOQING (author) / LI FUHE (author) / NING JUNHONG (author) / CHEN LINSHUANG (author)
2020-12-22
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Fabricated pile-slab wall and construction method thereof
European Patent Office | 2020
|Prestressed anchor cable slab-pile wall construction method
European Patent Office | 2024
|Assembly type prefabricated baffle circular pile slab-pile wall and construction method thereof
European Patent Office | 2020
|