A platform for research: civil engineering, architecture and urbanism
Tower crane foundation structure
The invention discloses a tower crane foundation structure. The tower crane foundation structure comprises a foundation, wherein a pre-buried pit is formed in the top of the foundation; the pre-buried pit is filled with an anti-sedimentation base layer; a pre-planting plate is arranged at the top of the anti-sedimentation base layer; mounting holes are formed in the two sides of the top of the pre-planting plate; stable tamping nails are inserted into the mounting holes; and a stable base is fixedly mounted at the top of the pre-planting plate. According to the tower crane foundation structure, the pre-sedimentation base layer is pre-arranged and is used for carrying out tamping and anti-seepage treatment on base layer soil; the foundation is reinforced by utilizing the stable tamping nails, the stable base, a fixing device and the like; a supporting plate and a stable platform are used for fixing a tower crane foot box and a bearing frame at the bottom of the tower crane foot box, so that the foundation of the tower crane foundation is good and is not easy to settle; and waterproof and water-discharging structures including a waterproof base plate, a water-discharging plate and the like are used for preventing water from seeping into the foundation to cause the foundation to be loosened or cause rusting on iron parts, so that the sedimentation of the foundation is reduced; a detection device is used for detecting.
本发明公开了一种塔吊基础结构,包括地基,所述地基地顶部开设有预埋坑,所述预埋坑的内部填充有防沉降基层,所述防沉降基层的顶部设有预植板,所述预植板的顶部两侧开设有安装孔,所述安装孔内插接有稳固夯钉,所述预植板的顶部固定安装有稳固底座。通过预设防沉降基层对基层土进行夯实防渗处理,利用稳固夯钉、稳固底座和固定装置等对地基进行加强,利用扶持板和稳固台对塔吊脚箱及其底部的承接架进行固定,从而使得本塔吊基础的地基基础好,不易沉降,利用防水基板和排水板等防水排水结构防止水渗入基础内部导致地基松垮,或对铁制件造成锈蚀,从而减少地基沉降,并且利用检测装置进行检测。
Tower crane foundation structure
The invention discloses a tower crane foundation structure. The tower crane foundation structure comprises a foundation, wherein a pre-buried pit is formed in the top of the foundation; the pre-buried pit is filled with an anti-sedimentation base layer; a pre-planting plate is arranged at the top of the anti-sedimentation base layer; mounting holes are formed in the two sides of the top of the pre-planting plate; stable tamping nails are inserted into the mounting holes; and a stable base is fixedly mounted at the top of the pre-planting plate. According to the tower crane foundation structure, the pre-sedimentation base layer is pre-arranged and is used for carrying out tamping and anti-seepage treatment on base layer soil; the foundation is reinforced by utilizing the stable tamping nails, the stable base, a fixing device and the like; a supporting plate and a stable platform are used for fixing a tower crane foot box and a bearing frame at the bottom of the tower crane foot box, so that the foundation of the tower crane foundation is good and is not easy to settle; and waterproof and water-discharging structures including a waterproof base plate, a water-discharging plate and the like are used for preventing water from seeping into the foundation to cause the foundation to be loosened or cause rusting on iron parts, so that the sedimentation of the foundation is reduced; a detection device is used for detecting.
本发明公开了一种塔吊基础结构,包括地基,所述地基地顶部开设有预埋坑,所述预埋坑的内部填充有防沉降基层,所述防沉降基层的顶部设有预植板,所述预植板的顶部两侧开设有安装孔,所述安装孔内插接有稳固夯钉,所述预植板的顶部固定安装有稳固底座。通过预设防沉降基层对基层土进行夯实防渗处理,利用稳固夯钉、稳固底座和固定装置等对地基进行加强,利用扶持板和稳固台对塔吊脚箱及其底部的承接架进行固定,从而使得本塔吊基础的地基基础好,不易沉降,利用防水基板和排水板等防水排水结构防止水渗入基础内部导致地基松垮,或对铁制件造成锈蚀,从而减少地基沉降,并且利用检测装置进行检测。
Tower crane foundation structure
一种塔吊基础结构
2021-04-09
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Method for arranging tower crane foundation and tower crane foundation structure
European Patent Office | 2023
|Tower crane foundation structure of construction-free tower crane pile
European Patent Office | 2024
|