A platform for research: civil engineering, architecture and urbanism
Large accident water tower reservoir lifting support
The invention relates to a lifting bracket for a reservoir of a large-scale accident water tower, which utilizes the top surface of a tower body of the water tower as a concrete foundation, and comprises an upper ring beam structure, a lower ring beam structure, a jack and a supporting upright post. A plurality of jacks are arranged between the upper ring beam structure and the lower ring beam structure and evenly distributed in the circumferential direction of the top face of the lower ring beam structure. The supporting stand column is vertically installed on the top face of the water tower body through the stand column bottom plate, and the lower ring beam structure is vertically welded to the upper end of the supporting stand column. The top face of an existing concrete tower body serves as a foundation of the hoisting platform, a hoisting platform supporting foundation does not need to be manufactured, the manufacturing steps of the hoisting platform are simplified, material input is reduced, cost is saved, and working efficiency is improved.
一种大型事故水塔蓄水池提升支架,所述大型事故水塔蓄水池提升支架利用水塔塔身顶面作为混凝土基础,所述大型事故水塔蓄水池提升支架包括上环梁结构、下环梁结构、千斤顶和支撑立柱;所述上环梁结构和下环梁结构之间设置有多个千斤顶,多个千斤顶沿下环梁结构顶面圆周方向均布;所述支撑立柱通过立柱底板垂直安装在水塔塔身顶面上,所述下环梁结构垂直焊接在支撑立柱的上端。利用现有的混凝土塔身顶面作为吊装平台的基础,不需制作吊装平台支撑基础,精简吊装平台制作步骤,减少材料投入,节约成本,提高了工作效率。
Large accident water tower reservoir lifting support
The invention relates to a lifting bracket for a reservoir of a large-scale accident water tower, which utilizes the top surface of a tower body of the water tower as a concrete foundation, and comprises an upper ring beam structure, a lower ring beam structure, a jack and a supporting upright post. A plurality of jacks are arranged between the upper ring beam structure and the lower ring beam structure and evenly distributed in the circumferential direction of the top face of the lower ring beam structure. The supporting stand column is vertically installed on the top face of the water tower body through the stand column bottom plate, and the lower ring beam structure is vertically welded to the upper end of the supporting stand column. The top face of an existing concrete tower body serves as a foundation of the hoisting platform, a hoisting platform supporting foundation does not need to be manufactured, the manufacturing steps of the hoisting platform are simplified, material input is reduced, cost is saved, and working efficiency is improved.
一种大型事故水塔蓄水池提升支架,所述大型事故水塔蓄水池提升支架利用水塔塔身顶面作为混凝土基础,所述大型事故水塔蓄水池提升支架包括上环梁结构、下环梁结构、千斤顶和支撑立柱;所述上环梁结构和下环梁结构之间设置有多个千斤顶,多个千斤顶沿下环梁结构顶面圆周方向均布;所述支撑立柱通过立柱底板垂直安装在水塔塔身顶面上,所述下环梁结构垂直焊接在支撑立柱的上端。利用现有的混凝土塔身顶面作为吊装平台的基础,不需制作吊装平台支撑基础,精简吊装平台制作步骤,减少材料投入,节约成本,提高了工作效率。
Large accident water tower reservoir lifting support
大型事故水塔蓄水池提升支架
CHEN HAIDONG (author) / HUANG PINGZU (author) / LI CHUNSONG (author) / LAN BINLONG (author) / SHEN XIAORONG (author)
2021-05-07
Patent
Electronic Resource
Chinese
Construction method for lifting large accident water tower reservoir
European Patent Office | 2021
|Method for lifting large water tank of accident water tower
European Patent Office | 2022
|Adjusting device for tower body of communication lifting tower and tower body lifting method
European Patent Office | 2023
|