INSTALLATION METHOD AND DEVICE FOR STEEL SHEET PILE
PROBLEM TO BE SOLVED: To provide an epoch-making installation method and a device for a steel sheet pile that allow a steel sheet pile to be installed simultaneously with drilling by a down-the-hole hammer.SOLUTION: Hooking means for a bottom edge of a steel sheet pile is formed on a down-the-hole hammer disposed at a lower part of an excavation shaft. Hooked means is formed at the bottom edge of the steel sheet pile, for detachably hooking the hooking means. The bottom edge of the steel sheet pile is hooked on the down-the-hole hammer that is hung, and the steel sheet pile is installed along with excavation by the down-the-hole hammer. (The steel sheet pile is installed using excavation by the down-the-hole hammer and vibration exerted on the steel sheet pile by the down-the-hole hammer.)SELECTED DRAWING: Figure 1
【課題】ダウンザホールハンマで削孔をしながら同時に鋼矢板を打込むことができる画期的な鋼矢板の打設工法および装置を提供する。【解決手段】掘削軸下部に設けるダウンザホールハンマに鋼矢板下端部の掛止手段を設け、鋼矢板下端にはこの掛止手段が着脱自在に掛止する被掛止手段を設け、吊り下げるダウンザホールハンマに下端を掛止して鋼矢板を沿わせ、ダウンザホールハンマによる掘削に沿わせて鋼矢板を打設する(ダウンザホールハンマによる掘削とダウンザホールハンマが鋼矢板に与える振動を用いて鋼矢板を打設する)。【選択図】 図1
INSTALLATION METHOD AND DEVICE FOR STEEL SHEET PILE
PROBLEM TO BE SOLVED: To provide an epoch-making installation method and a device for a steel sheet pile that allow a steel sheet pile to be installed simultaneously with drilling by a down-the-hole hammer.SOLUTION: Hooking means for a bottom edge of a steel sheet pile is formed on a down-the-hole hammer disposed at a lower part of an excavation shaft. Hooked means is formed at the bottom edge of the steel sheet pile, for detachably hooking the hooking means. The bottom edge of the steel sheet pile is hooked on the down-the-hole hammer that is hung, and the steel sheet pile is installed along with excavation by the down-the-hole hammer. (The steel sheet pile is installed using excavation by the down-the-hole hammer and vibration exerted on the steel sheet pile by the down-the-hole hammer.)SELECTED DRAWING: Figure 1
【課題】ダウンザホールハンマで削孔をしながら同時に鋼矢板を打込むことができる画期的な鋼矢板の打設工法および装置を提供する。【解決手段】掘削軸下部に設けるダウンザホールハンマに鋼矢板下端部の掛止手段を設け、鋼矢板下端にはこの掛止手段が着脱自在に掛止する被掛止手段を設け、吊り下げるダウンザホールハンマに下端を掛止して鋼矢板を沿わせ、ダウンザホールハンマによる掘削に沿わせて鋼矢板を打設する(ダウンザホールハンマによる掘削とダウンザホールハンマが鋼矢板に与える振動を用いて鋼矢板を打設する)。【選択図】 図1
INSTALLATION METHOD AND DEVICE FOR STEEL SHEET PILE
鋼矢板の打設工法および装置
GOMI KENJI (author)
2016-05-09
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
STEEL PIPE SHEET PILE AND INSTALLATION METHOD OF STEEL PIPE SHEET PILE
European Patent Office | 2020
|European Patent Office | 2015
|STEEL PIPE SHEET PILE AND INSTALLATION AUXILIARY IMPLEMENT OF STEEL PIPE SHEET PILE
European Patent Office | 2015
|