Dismantling device and dismantling method for communication tower with lightning rod
The invention relates to a dismounting device with a lightning rod for a communication tower and a dismounting method, relates to the field of communication tower mounting and dismounting, and aims to solve the problems that for a communication tower which is about 40 meters higher than a roof, generally, wall connecting pieces are difficult to arrange, the length limitation requirement of a free cantilever of the tower crane is difficult to meet, and the tower crane with a larger tonnage needs to be adopted. In order to solve the problems of high construction site requirement, long construction period and high construction cost due to the fact that a large tower crane is adopted for dismantling, the communication tower comprises a lengthening rod, a sliding assembly and a driving assembly, the lengthening rod can be connected with a dismantling base, the driving assembly is installed on a tower body of the communication tower, and the sliding assembly is connected with the lengthening rod and is driven by the driving assembly to slide. Therefore, the extension bar is driven to move along the height direction. The method has the effects that the construction safety is improved, the construction period is shortened, and the leasing fee of the tower crane is saved.
本申请涉及一种带有避雷针的通讯塔用拆除装置及拆除方法,涉及通讯塔安装拆卸领域,为了解决对于高出屋顶40米左右的通讯塔,一般设置连墙件困难,难以满足塔吊自由悬臂长度限制要求,需要采用更大吨位的塔吊。采用大型塔吊拆除,施工场地要求高,施工周期长,施工成本高的问题,其包括加长杆、滑移组件和驱动组件,所述加长杆可与拆卸基座相连,所述驱动组件安装在通讯塔的塔体上,所述滑移组件与加长杆相连,并被驱动组件驱动滑移,从而带动加长杆沿高度方向移动。本申请具有提高了施工的安全性、缩短工期的效果、节省了塔吊的租赁费。
Dismantling device and dismantling method for communication tower with lightning rod
The invention relates to a dismounting device with a lightning rod for a communication tower and a dismounting method, relates to the field of communication tower mounting and dismounting, and aims to solve the problems that for a communication tower which is about 40 meters higher than a roof, generally, wall connecting pieces are difficult to arrange, the length limitation requirement of a free cantilever of the tower crane is difficult to meet, and the tower crane with a larger tonnage needs to be adopted. In order to solve the problems of high construction site requirement, long construction period and high construction cost due to the fact that a large tower crane is adopted for dismantling, the communication tower comprises a lengthening rod, a sliding assembly and a driving assembly, the lengthening rod can be connected with a dismantling base, the driving assembly is installed on a tower body of the communication tower, and the sliding assembly is connected with the lengthening rod and is driven by the driving assembly to slide. Therefore, the extension bar is driven to move along the height direction. The method has the effects that the construction safety is improved, the construction period is shortened, and the leasing fee of the tower crane is saved.
本申请涉及一种带有避雷针的通讯塔用拆除装置及拆除方法,涉及通讯塔安装拆卸领域,为了解决对于高出屋顶40米左右的通讯塔,一般设置连墙件困难,难以满足塔吊自由悬臂长度限制要求,需要采用更大吨位的塔吊。采用大型塔吊拆除,施工场地要求高,施工周期长,施工成本高的问题,其包括加长杆、滑移组件和驱动组件,所述加长杆可与拆卸基座相连,所述驱动组件安装在通讯塔的塔体上,所述滑移组件与加长杆相连,并被驱动组件驱动滑移,从而带动加长杆沿高度方向移动。本申请具有提高了施工的安全性、缩短工期的效果、节省了塔吊的租赁费。
Dismantling device and dismantling method for communication tower with lightning rod
一种带有避雷针的通讯塔用拆除装置及拆除方法
ZHU RONGJUN (author) / ZHENG GUANYU (author) / JIANG QING (author) / TANG HUAGANG (author) / MEI YINGBAO (author) / YOU XUECHUN (author) / SUN YUJIE (author) / HAO PENGYANG (author) / SUN JIAN (author)
2023-02-24
Patent
Electronic Resource
Chinese
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
TOWER-SHAPED STRUCTURE DISMANTLING METHOD AND TOWER-SHAPED STRUCTURE DISMANTLING DEVICE
European Patent Office | 2021
|Dismantling method and dismantling auxiliary device for mixed tower
European Patent Office | 2024
|Dismantling method and dismantling system for chemical debenzolization tower
European Patent Office | 2022
|Cable-stayed bridge main tower dismantling method and multifunctional tower dismantling machine
European Patent Office | 2024
|Dismantling structure and dismantling method of alpine and valley ultrahigh tower
European Patent Office | 2023
|