Guy rope hanging basket walking system
The invention belongs to the technical field of concrete cable-stayed bridge construction, and particularly relates to a cable-stayed hanging basket walking system which comprises two guide rails which are spaced in parallel. The hanging basket is arranged below the guide rail, and hanging legs are installed in the middles of the two sides of the hanging basket; the leg hanging seat and the walking sliding block are mounted on the guide rail; the hydraulic rod is hinged with the walking sliding block and the leg hanging seat; and the right-angle buffer seat is arranged on the guide rail, is connected with the hanging leg and can play a role in buffering the hanging leg seat. Through the arrangement of the walking buffer mechanism, the influence of inertia in the walking process of the hanging basket is effectively reduced, the moving speed of the hanging basket is increased, and the problem that the hanging basket is not easy to control due to the influence of inertia is solved. In addition, a synchronizing mechanism is arranged between the hanging legs, so that the synchronism of the two hanging legs in the moving process is improved, and safety accidents caused by torsion due to asynchronous walking of the hanging legs on the two sides in the walking process of the hanging basket are avoided.
本发明属于混凝土斜拉桥施工技术领域,具体涉及一种牵索挂篮行走系统,包括:平行间隔的2根导轨;设置于所述导轨下方的挂篮,所述挂篮两侧中部均安装有挂腿;安装于所述导轨上的挂腿座和行走滑块;铰接行走滑块及挂腿座的液压杆;安装于所述导轨上的直角缓冲座,所述直角缓冲座连接所述挂腿并能对挂腿座起到缓冲作用。本发明通过行走缓冲机构的设置,有效降低了挂篮行走过程中惯性的影响,提高了挂篮移动速度,避免挂篮受惯性影响不易控制的问题。另外,本发明通过挂腿之间设置同步机构,提高两个挂腿移动过程中的同步性,避免挂篮行走过程中,由于两侧挂腿行走不同步造成扭转,从而导致的安全事故。
Guy rope hanging basket walking system
The invention belongs to the technical field of concrete cable-stayed bridge construction, and particularly relates to a cable-stayed hanging basket walking system which comprises two guide rails which are spaced in parallel. The hanging basket is arranged below the guide rail, and hanging legs are installed in the middles of the two sides of the hanging basket; the leg hanging seat and the walking sliding block are mounted on the guide rail; the hydraulic rod is hinged with the walking sliding block and the leg hanging seat; and the right-angle buffer seat is arranged on the guide rail, is connected with the hanging leg and can play a role in buffering the hanging leg seat. Through the arrangement of the walking buffer mechanism, the influence of inertia in the walking process of the hanging basket is effectively reduced, the moving speed of the hanging basket is increased, and the problem that the hanging basket is not easy to control due to the influence of inertia is solved. In addition, a synchronizing mechanism is arranged between the hanging legs, so that the synchronism of the two hanging legs in the moving process is improved, and safety accidents caused by torsion due to asynchronous walking of the hanging legs on the two sides in the walking process of the hanging basket are avoided.
本发明属于混凝土斜拉桥施工技术领域,具体涉及一种牵索挂篮行走系统,包括:平行间隔的2根导轨;设置于所述导轨下方的挂篮,所述挂篮两侧中部均安装有挂腿;安装于所述导轨上的挂腿座和行走滑块;铰接行走滑块及挂腿座的液压杆;安装于所述导轨上的直角缓冲座,所述直角缓冲座连接所述挂腿并能对挂腿座起到缓冲作用。本发明通过行走缓冲机构的设置,有效降低了挂篮行走过程中惯性的影响,提高了挂篮移动速度,避免挂篮受惯性影响不易控制的问题。另外,本发明通过挂腿之间设置同步机构,提高两个挂腿移动过程中的同步性,避免挂篮行走过程中,由于两侧挂腿行走不同步造成扭转,从而导致的安全事故。
Guy rope hanging basket walking system
一种牵索挂篮行走系统
MEI HUIHAO (author) / ZHOU HAN (author) / ZHOU XUHUI (author) / LI XINGYONG (author) / CHEN LONG (author) / PENG HAO (author) / ZHANG DECHANG (author) / ZENG JINHE (author) / LI YIFEI (author) / SONG JINJU (author)
2023-12-26
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Self-walking guy rope hanging basket device and moving method of guy rope hanging basket
European Patent Office | 2022
|Walking hanging basket and installing method of walking hanging basket
European Patent Office | 2015
|Front fulcrum hanging basket and hanging basket walking method
European Patent Office | 2023
|