A platform for research: civil engineering, architecture and urbanism
Platform for installing wind power concrete tower drum
The invention relates to a platform for installing a wind power concrete tower drum. Comprising a framework assembly, a platform assembly, a fence assembly and a hoisting installation assembly. The framework assembly comprises a middle framework device, and a plurality of groups of first extending arm devices and two groups of second extending arm devices are inserted on the middle framework device in a sliding manner; the lengths of the first extending arm device and the second extending arm device are adjustable; the platform assembly comprises a fixed platform structure and a detachable platform structure, and the detachable platform structure is detachably connected with the first extending arm device and the second extending arm device; the fence assembly comprises a fixed fence installed on the middle framework device and further comprises a plurality of sets of movable fence devices installed at the outer ends of the first extending arm devices and the second extending arm devices respectively. The guardrail iron chain is arranged between the fixed guardrail device and the movable guardrail device; the lifting installation assembly comprises a plurality of sets of platform lifting rings and further comprises a plurality of sets of hanging structures installed at the outer ends of the first extending arm device and the second extending arm device. The method can meet the continuous installation operation requirement of the large-diameter wind power concrete tower drum, and is high in applicability.
本发明涉及一种风电混凝土塔筒安装用平台。包括骨架总成、平台总成、围栏总成和起吊安装总成;骨架总成包括中间骨架装置,在其上滑动插设有多组第一伸臂装置和两组第二伸臂装置;第一、第二伸臂装置的长度均可调;平台总成包括固定台结构和可拆台结构,可拆台结构与第一、第二伸臂装置可拆卸连接;围栏总成包括在中间骨架装置上安装的固定护栏,还包括分别安装在各个第一、第二伸臂装置的外端部的多组可动护栏装置;还包括在固定护栏和可动护栏装置之间安装的护栏铁链;起吊安装总成包括多组平台吊环,还包括在各个第一、第二伸臂装置的外端部安装的多组吊挂结构。本发明能够满足大直径风电混凝土他塔筒的连续安装作业要求,适用性强。
Platform for installing wind power concrete tower drum
The invention relates to a platform for installing a wind power concrete tower drum. Comprising a framework assembly, a platform assembly, a fence assembly and a hoisting installation assembly. The framework assembly comprises a middle framework device, and a plurality of groups of first extending arm devices and two groups of second extending arm devices are inserted on the middle framework device in a sliding manner; the lengths of the first extending arm device and the second extending arm device are adjustable; the platform assembly comprises a fixed platform structure and a detachable platform structure, and the detachable platform structure is detachably connected with the first extending arm device and the second extending arm device; the fence assembly comprises a fixed fence installed on the middle framework device and further comprises a plurality of sets of movable fence devices installed at the outer ends of the first extending arm devices and the second extending arm devices respectively. The guardrail iron chain is arranged between the fixed guardrail device and the movable guardrail device; the lifting installation assembly comprises a plurality of sets of platform lifting rings and further comprises a plurality of sets of hanging structures installed at the outer ends of the first extending arm device and the second extending arm device. The method can meet the continuous installation operation requirement of the large-diameter wind power concrete tower drum, and is high in applicability.
本发明涉及一种风电混凝土塔筒安装用平台。包括骨架总成、平台总成、围栏总成和起吊安装总成;骨架总成包括中间骨架装置,在其上滑动插设有多组第一伸臂装置和两组第二伸臂装置;第一、第二伸臂装置的长度均可调;平台总成包括固定台结构和可拆台结构,可拆台结构与第一、第二伸臂装置可拆卸连接;围栏总成包括在中间骨架装置上安装的固定护栏,还包括分别安装在各个第一、第二伸臂装置的外端部的多组可动护栏装置;还包括在固定护栏和可动护栏装置之间安装的护栏铁链;起吊安装总成包括多组平台吊环,还包括在各个第一、第二伸臂装置的外端部安装的多组吊挂结构。本发明能够满足大直径风电混凝土他塔筒的连续安装作业要求,适用性强。
Platform for installing wind power concrete tower drum
一种风电混凝土塔筒安装用平台
GUO BIN (author) / GAO WANYU (author) / LIU DING (author) / WANG HONGYUN (author) / YU CHUNSHENG (author)
2024-04-26
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Method for manufacturing, transferring and installing conversion section concrete tower drum
European Patent Office | 2022
|Wind power tower, tower drum and construction method of tower drum
European Patent Office | 2023
|Tower drum ladder stand support and wind power tower drum
European Patent Office | 2024
|