Steel beam support changing structure penetrating through two sides of secant pile and construction method of steel beam support changing structure
The invention discloses a support changing structure for steel beams penetrating through the two sides of a secant pile and a construction method of the support changing structure. The support changing structure for the steel beams penetrating through the two sides of the secant pile comprises the secant pile, a first beam plate assembly, a second beam plate assembly and a support changing steel beam. The secant pile is vertically arranged, and the first beam plate assembly and the second beam plate assembly are located on the two sides of the secant pile correspondingly. The support changing steel beam penetrates through the secant piles, and the two ends of the support changing steel beam are anchored into the first beam plate assembly and the second beam plate assembly correspondingly. By arranging the support changing steel beam penetrating through the secant pile, the support changing steel beam is anchored into the first beam plate assembly and the second beam plate assembly on the two sides of the secant pile, and the force transmission continuity of the first beam plate assembly and the second beam plate assembly is guaranteed. After the secant piles are dismantled, the support changing steel beams do not need to be dismantled, and then the beam and slab assembly is constructed from bottom to top. The construction process in the prior art is simplified, and the support changing safety and the strength of the main body structure are enhanced.
本发明公开了一种贯通咬合桩两侧的钢梁换撑结构及其施工方法,贯通咬合桩两侧的钢梁换撑结构包括咬合桩、第一梁板组件、第二梁板组件以及换撑钢梁;咬合桩垂直设置,第一梁板组件以及第二梁板组件分别位于咬合桩的两侧;换撑钢梁穿过咬合桩,换撑钢梁的两端分别锚入第一梁板组件以及第二梁板组件内。通过设置穿过咬合桩的换撑钢梁,换撑钢梁锚入到咬合桩两侧的第一梁板组件以及第二梁板组件内,保证了第一梁板组件和第二梁板组件的传力连续性。在咬合桩拆除后,换撑钢梁无需拆除,然后自下往上地施工梁板组件。既简化了现有技术的施工工序,又增强了换撑安全性和主体结构的强度。
Steel beam support changing structure penetrating through two sides of secant pile and construction method of steel beam support changing structure
The invention discloses a support changing structure for steel beams penetrating through the two sides of a secant pile and a construction method of the support changing structure. The support changing structure for the steel beams penetrating through the two sides of the secant pile comprises the secant pile, a first beam plate assembly, a second beam plate assembly and a support changing steel beam. The secant pile is vertically arranged, and the first beam plate assembly and the second beam plate assembly are located on the two sides of the secant pile correspondingly. The support changing steel beam penetrates through the secant piles, and the two ends of the support changing steel beam are anchored into the first beam plate assembly and the second beam plate assembly correspondingly. By arranging the support changing steel beam penetrating through the secant pile, the support changing steel beam is anchored into the first beam plate assembly and the second beam plate assembly on the two sides of the secant pile, and the force transmission continuity of the first beam plate assembly and the second beam plate assembly is guaranteed. After the secant piles are dismantled, the support changing steel beams do not need to be dismantled, and then the beam and slab assembly is constructed from bottom to top. The construction process in the prior art is simplified, and the support changing safety and the strength of the main body structure are enhanced.
本发明公开了一种贯通咬合桩两侧的钢梁换撑结构及其施工方法,贯通咬合桩两侧的钢梁换撑结构包括咬合桩、第一梁板组件、第二梁板组件以及换撑钢梁;咬合桩垂直设置,第一梁板组件以及第二梁板组件分别位于咬合桩的两侧;换撑钢梁穿过咬合桩,换撑钢梁的两端分别锚入第一梁板组件以及第二梁板组件内。通过设置穿过咬合桩的换撑钢梁,换撑钢梁锚入到咬合桩两侧的第一梁板组件以及第二梁板组件内,保证了第一梁板组件和第二梁板组件的传力连续性。在咬合桩拆除后,换撑钢梁无需拆除,然后自下往上地施工梁板组件。既简化了现有技术的施工工序,又增强了换撑安全性和主体结构的强度。
Steel beam support changing structure penetrating through two sides of secant pile and construction method of steel beam support changing structure
贯通咬合桩两侧的钢梁换撑结构及其施工方法
ZHENG JIE (author) / BAO QICHANG (author) / CUI ZHIYONG (author) / QIU WENPING (author) / HU ZILAI (author)
2024-08-27
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Steel beam support changing structure and support changing construction method
European Patent Office | 2024
|European Patent Office | 2021
|Steel plate concrete secant pile structure in foundation pit support and construction method
European Patent Office | 2022
|Partially recoverable secant pile support structure and construction method
European Patent Office | 2020
|Foundation pit waist beam steel pipe tape support-changing construction method
European Patent Office | 2015
|