INSTALLATION FOUNDATION STRUCTURE
PROBLEM TO BE SOLVED: To provide an installation foundation structure that saves labor and costs necessary for installation and curtails construction period.SOLUTION: An installation foundation structure 10A includes: a hollow groundsill pipe 11a having an adjustment bolt 24 for adjusting a height and an inclination and a deformation preventing material 25 for preventing deformation of first to fourth side walls 21a to 21d; bottom part frame materials 13a to 13d fixed at a bottom part of the groundsill pipe 11a; a crown part frame material installed detachably at a crown part of the groundsill pipe 11a; a newly installed waterproof material 16 installed over an entire outer peripheral surface of the groundsill pipe 11a and the bottom part frame materials 13a to 13d; and concrete 18 cast in an inner space 17. With the installation foundation structure 10A, an installation work thereof is completed before curing of the concrete 18 cast in the inner space 17.SELECTED DRAWING: Figure 2
【課題】設置に要する労力やコストを低減することができるとともに、工期を短縮することができる据付基礎構造物を提供する。【解決手段】据付基礎構造物10Aは、高さおよび傾きを調整する調整ボルト24および第1〜第4側壁21a〜21dの変形を防止する変形防止材25を有する中空の土台管11aと、土台管11aの底部に固定された底部枠材13a〜13dと、土台管11aの頂部に着脱可能に設置された頂部枠材と、土台管11aと底部枠材13a〜13dとの外周面全域に設置された新設防水材16と、内側スペース17に打設されたコンクリート18とから形成されている。据付基礎構造物10Aでは、内側スペース17に打設されたコンクリート18の養生前にその据付作業が完了する。【選択図】図2
INSTALLATION FOUNDATION STRUCTURE
PROBLEM TO BE SOLVED: To provide an installation foundation structure that saves labor and costs necessary for installation and curtails construction period.SOLUTION: An installation foundation structure 10A includes: a hollow groundsill pipe 11a having an adjustment bolt 24 for adjusting a height and an inclination and a deformation preventing material 25 for preventing deformation of first to fourth side walls 21a to 21d; bottom part frame materials 13a to 13d fixed at a bottom part of the groundsill pipe 11a; a crown part frame material installed detachably at a crown part of the groundsill pipe 11a; a newly installed waterproof material 16 installed over an entire outer peripheral surface of the groundsill pipe 11a and the bottom part frame materials 13a to 13d; and concrete 18 cast in an inner space 17. With the installation foundation structure 10A, an installation work thereof is completed before curing of the concrete 18 cast in the inner space 17.SELECTED DRAWING: Figure 2
【課題】設置に要する労力やコストを低減することができるとともに、工期を短縮することができる据付基礎構造物を提供する。【解決手段】据付基礎構造物10Aは、高さおよび傾きを調整する調整ボルト24および第1〜第4側壁21a〜21dの変形を防止する変形防止材25を有する中空の土台管11aと、土台管11aの底部に固定された底部枠材13a〜13dと、土台管11aの頂部に着脱可能に設置された頂部枠材と、土台管11aと底部枠材13a〜13dとの外周面全域に設置された新設防水材16と、内側スペース17に打設されたコンクリート18とから形成されている。据付基礎構造物10Aでは、内側スペース17に打設されたコンクリート18の養生前にその据付作業が完了する。【選択図】図2
INSTALLATION FOUNDATION STRUCTURE
据付基礎構造物
TAKAGI KAZUMASA (author) / TAKAGI EIZO (author) / ASAKURA MASASHI (author)
2016-07-25
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Novel photovoltaic support foundation installation structure and installation method