A platform for research: civil engineering, architecture and urbanism
To provide a building unit and a unit building that can be transported to a construction site with a flooring material attached to the building unit at the factory.SOLUTION: A building unit (entrance unit 10) includes short beams 17 arranged at intervals on one side of the floor side of a frame to which an entrance door 70 is attached, a temporary beam 20 arranged between the short beams 17 before the entrance door 70 is arranged, and an auxiliary beam 18 arranged orthogonal to the short beam 17. The temporary beam 20 and the auxiliary beam 18 can be attached to the short beam 17 via a receiving material (first receiving material, second receiving material). The auxiliary beam 18 is attached to the receiving material (first receiving material). The temporary beam 20 is detachably attached to the receiving material (first receiving material, second receiving material). The auxiliary beam 18 is covered with a floor material 30.SELECTED DRAWING: Figure 2
【課題】工場で床材を建物ユニットに取り付けた状態にして、建築現場に搬送することができる建物ユニット及びユニット建物を提供する。【解決手段】建物ユニット(玄関ユニット10)は、玄関ドア70が取り付けられる骨組体の床側の一辺に間隔をおいて配置される短梁17と、玄関ドア70の配置前の短梁17間に配置される仮梁20と、短梁17に直交して配置される補助梁18と、を備え、仮梁20と補助梁18は、受け材(第1受け材,第2受け材)を介して、短梁17に取り付け可能であり、補助梁18は、受け材(第1受け材)に取り付けられ、仮梁20は、受け材(第1受け材,第2受け材)に着脱可能に取り付けられ、補助梁18は、床材30で覆われている。【選択図】図2
To provide a building unit and a unit building that can be transported to a construction site with a flooring material attached to the building unit at the factory.SOLUTION: A building unit (entrance unit 10) includes short beams 17 arranged at intervals on one side of the floor side of a frame to which an entrance door 70 is attached, a temporary beam 20 arranged between the short beams 17 before the entrance door 70 is arranged, and an auxiliary beam 18 arranged orthogonal to the short beam 17. The temporary beam 20 and the auxiliary beam 18 can be attached to the short beam 17 via a receiving material (first receiving material, second receiving material). The auxiliary beam 18 is attached to the receiving material (first receiving material). The temporary beam 20 is detachably attached to the receiving material (first receiving material, second receiving material). The auxiliary beam 18 is covered with a floor material 30.SELECTED DRAWING: Figure 2
【課題】工場で床材を建物ユニットに取り付けた状態にして、建築現場に搬送することができる建物ユニット及びユニット建物を提供する。【解決手段】建物ユニット(玄関ユニット10)は、玄関ドア70が取り付けられる骨組体の床側の一辺に間隔をおいて配置される短梁17と、玄関ドア70の配置前の短梁17間に配置される仮梁20と、短梁17に直交して配置される補助梁18と、を備え、仮梁20と補助梁18は、受け材(第1受け材,第2受け材)を介して、短梁17に取り付け可能であり、補助梁18は、受け材(第1受け材)に取り付けられ、仮梁20は、受け材(第1受け材,第2受け材)に着脱可能に取り付けられ、補助梁18は、床材30で覆われている。【選択図】図2
BUILDING UNIT AND UNIT BUILDING
建物ユニット及びユニット建物
NANBU MASAHIKO (author)
2021-08-05
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
BUILDING UNIT TRANSPORTATION METHOD, BUILDING UNIT AND UNIT BUILDING
European Patent Office | 2015
|FLOOR HEATING UNIT, BUILDING, UNIT BUILDING AND BUILDING UNIT
European Patent Office | 2018
|BUILDING UNIT COVER, AND BUILDING UNIT COVERED BY BUILDING UNIT COVER
European Patent Office | 2015
|