REPAIR METHOD FOR FILLER LAYER OF CONCRETE SLAB TRACK
To provide a repair method for a filler layer of a concrete slab track which can repair in a short time, the CA mortar layer in an existing concrete slab track.SOLUTION: A repair method for a filler layer in a concrete slab track, which digs the filler layer located between a roadbed concrete and a track concrete slab in the concrete slab track from a side of the concrete slab track and filling a repair material therein, comprises: a first step of digging the filler layer down to a designated depth from the side of the concrete slab track; a second step of loading multiple pre-made blocks, which have a designated shape with strength greater than a prescribed level, in a row into a bag, which has a width approximately same as the depth of the dug part dug in the first step and a length approximately same as a length of said track concrete slab, and has a filler inlet hole; a third step of inserting said bag loaded with the multiple blocks into the dug part dug in the first step; and a fourth step of injecting a curing type repair material into said bag.SELECTED DRAWING: Figure 2
【課題】既設のスラブ軌道において短時間にCAモルタル層を補修することができるスラブ軌道における填充層の補修方法を提供する。【解決手段】スラブ軌道において路盤コンクリートと軌道スラブの間に設けられている填充層を、スラブ軌道の側方から掘削して補修材を充填するスラブ軌道における填充層の補修方法において、前記填充層をスラブ軌道の側方から所定の奥行深さまで掘削する第1工程と、第1工程により掘削された掘削部の奥行とほぼ同一の幅および前記軌道スラブの長さとほぼ同一の長さを有し充填剤注入口が設けられた袋の内部に、予め製造された所定形状および所定以上の強度を有する複数のブロックを1列に並べて装填する第2工程と、前記袋の内部に複数のブロックが装填されたものを、第1工程により掘削された掘削部へ挿入する第3工程と、前記袋の内部へ硬化型補修剤を注入する第4工程と、を含むようにした。【選択図】図2
REPAIR METHOD FOR FILLER LAYER OF CONCRETE SLAB TRACK
To provide a repair method for a filler layer of a concrete slab track which can repair in a short time, the CA mortar layer in an existing concrete slab track.SOLUTION: A repair method for a filler layer in a concrete slab track, which digs the filler layer located between a roadbed concrete and a track concrete slab in the concrete slab track from a side of the concrete slab track and filling a repair material therein, comprises: a first step of digging the filler layer down to a designated depth from the side of the concrete slab track; a second step of loading multiple pre-made blocks, which have a designated shape with strength greater than a prescribed level, in a row into a bag, which has a width approximately same as the depth of the dug part dug in the first step and a length approximately same as a length of said track concrete slab, and has a filler inlet hole; a third step of inserting said bag loaded with the multiple blocks into the dug part dug in the first step; and a fourth step of injecting a curing type repair material into said bag.SELECTED DRAWING: Figure 2
【課題】既設のスラブ軌道において短時間にCAモルタル層を補修することができるスラブ軌道における填充層の補修方法を提供する。【解決手段】スラブ軌道において路盤コンクリートと軌道スラブの間に設けられている填充層を、スラブ軌道の側方から掘削して補修材を充填するスラブ軌道における填充層の補修方法において、前記填充層をスラブ軌道の側方から所定の奥行深さまで掘削する第1工程と、第1工程により掘削された掘削部の奥行とほぼ同一の幅および前記軌道スラブの長さとほぼ同一の長さを有し充填剤注入口が設けられた袋の内部に、予め製造された所定形状および所定以上の強度を有する複数のブロックを1列に並べて装填する第2工程と、前記袋の内部に複数のブロックが装填されたものを、第1工程により掘削された掘削部へ挿入する第3工程と、前記袋の内部へ硬化型補修剤を注入する第4工程と、を含むようにした。【選択図】図2
REPAIR METHOD FOR FILLER LAYER OF CONCRETE SLAB TRACK
スラブ軌道における填充層の補修方法
SATO SAKI (author) / KOZU DAISUKE (author)
2022-10-27
Patent
Electronic Resource
Japanese