REPAIR METHOD FOR FILLER LAYER OF CONCRETE SLAB TRACK
To provide a repair method for a filler layer of a concrete slab track which can repair in a short time, the CA mortar layer in an existing concrete slab track.SOLUTION: A repair method for a concrete slab track, which digs a filler layer located between a roadbed concrete and a track concrete slab in the concrete slab track from a side of the concrete slab track and filling a repair material therein, comprises: a first step of digging said filler layer down to a designated depth from the side of the concrete slab track; a second step of loading a pre-made block, which has a designated shape with strength greater than a prescribed level, into each of multiple bags, which has a width approximately same as the depth of the dug part dug in the first step and a length 1/n (n is a positive integer) of a length of said track concrete slab, and has a filler inlet hole; a third step of inserting filler blocks, i.e. said bags loaded with the blocks, in a row into the dug part dug in the first step; and a fourth step of injecting a curing type repair material into said bags.SELECTED DRAWING: Figure 2
【課題】既設のスラブ軌道において短時間にCAモルタル層を補修することができるスラブ軌道における填充層の補修方法を提供する。【解決手段】スラブ軌道において路盤コンクリートと軌道スラブの間に設けられている填充層を、スラブ軌道の側方から掘削して補修材を充填するスラブ軌道補修方法において、前記填充層をスラブ軌道の側方から所定の奥行深さまで掘削する第1工程と、第1工程により掘削された掘削部の奥行とほぼ同一の幅を有し前記軌道スラブの長さの1/n(nは正の整数)の長さを有し充填剤注入口が設けられた複数の袋の内部に、予め製造された所定形状および所定以上の強度を有するブロックをそれぞれ1つずつ装填する第2工程と、前記袋の内部にブロックが装填されたブロック充填体を、第1工程により掘削された掘削部へ1列に並べて挿入する第3工程と、前記袋の内部へ硬化型補修剤を注入する第4工程と、を含むようにした。【選択図】図2
REPAIR METHOD FOR FILLER LAYER OF CONCRETE SLAB TRACK
To provide a repair method for a filler layer of a concrete slab track which can repair in a short time, the CA mortar layer in an existing concrete slab track.SOLUTION: A repair method for a concrete slab track, which digs a filler layer located between a roadbed concrete and a track concrete slab in the concrete slab track from a side of the concrete slab track and filling a repair material therein, comprises: a first step of digging said filler layer down to a designated depth from the side of the concrete slab track; a second step of loading a pre-made block, which has a designated shape with strength greater than a prescribed level, into each of multiple bags, which has a width approximately same as the depth of the dug part dug in the first step and a length 1/n (n is a positive integer) of a length of said track concrete slab, and has a filler inlet hole; a third step of inserting filler blocks, i.e. said bags loaded with the blocks, in a row into the dug part dug in the first step; and a fourth step of injecting a curing type repair material into said bags.SELECTED DRAWING: Figure 2
【課題】既設のスラブ軌道において短時間にCAモルタル層を補修することができるスラブ軌道における填充層の補修方法を提供する。【解決手段】スラブ軌道において路盤コンクリートと軌道スラブの間に設けられている填充層を、スラブ軌道の側方から掘削して補修材を充填するスラブ軌道補修方法において、前記填充層をスラブ軌道の側方から所定の奥行深さまで掘削する第1工程と、第1工程により掘削された掘削部の奥行とほぼ同一の幅を有し前記軌道スラブの長さの1/n(nは正の整数)の長さを有し充填剤注入口が設けられた複数の袋の内部に、予め製造された所定形状および所定以上の強度を有するブロックをそれぞれ1つずつ装填する第2工程と、前記袋の内部にブロックが装填されたブロック充填体を、第1工程により掘削された掘削部へ1列に並べて挿入する第3工程と、前記袋の内部へ硬化型補修剤を注入する第4工程と、を含むようにした。【選択図】図2
REPAIR METHOD FOR FILLER LAYER OF CONCRETE SLAB TRACK
スラブ軌道における填充層の補修方法
SATO SAKI (author) / KOZU DAISUKE (author)
2022-10-27
Patent
Electronic Resource
Japanese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau