BUILDING RECONSTRUCTION METHOD
To provide a building reconstruction method capable of reconstructing a building within a short construction period.SOLUTION: This building reconstruction method overhauls an existing underground skeleton 10 to construct a new building 3. The building reconstruction method comprises: a step S2 of constructing a permanent structural column foundation 51 for supporting a permanent structural column 50 on an existing pressure board 21 of the existing underground skeleton; a step S3 of building the permanent structural column 50 on the permanent structural column foundation 51; a step S4 of constructing a first floor skeleton 34A through support by the permanent structural column 50; and steps S5A and S5B of constructing a ground skeleton 4 of the new building on the upper side of the first floor skeleton 34A and removing the existing underground skeleton 10 on the lower side of the first floor skeleton 34A to construct an underground skeleton 30 of the new building 3.SELECTED DRAWING: Figure 5
【課題】短工期で建物を建て替えることができる建物の建て替え方法を提供すること。【解決手段】建物の建て替え方法は、既存地下躯体10を解体して新築建物3に建て替える。この建物の建て替え方法は、既存地下躯体の既存の耐圧盤21上に構真柱50を支持するための構真柱基礎51を構築するステップS2と、構真柱基礎51上に構真柱50を建て込むステップS3と、構真柱50で支持して1階床躯体34Aを構築するステップS4と、1階床躯体34Aの上側では、新築建物の地上躯体4を構築しつつ、1階床躯体34Aの下側では、既存地下躯体10を撤去して新築建物3の地下躯体30を構築するステップS5A、S5Bと、を備える。【選択図】図5
BUILDING RECONSTRUCTION METHOD
To provide a building reconstruction method capable of reconstructing a building within a short construction period.SOLUTION: This building reconstruction method overhauls an existing underground skeleton 10 to construct a new building 3. The building reconstruction method comprises: a step S2 of constructing a permanent structural column foundation 51 for supporting a permanent structural column 50 on an existing pressure board 21 of the existing underground skeleton; a step S3 of building the permanent structural column 50 on the permanent structural column foundation 51; a step S4 of constructing a first floor skeleton 34A through support by the permanent structural column 50; and steps S5A and S5B of constructing a ground skeleton 4 of the new building on the upper side of the first floor skeleton 34A and removing the existing underground skeleton 10 on the lower side of the first floor skeleton 34A to construct an underground skeleton 30 of the new building 3.SELECTED DRAWING: Figure 5
【課題】短工期で建物を建て替えることができる建物の建て替え方法を提供すること。【解決手段】建物の建て替え方法は、既存地下躯体10を解体して新築建物3に建て替える。この建物の建て替え方法は、既存地下躯体の既存の耐圧盤21上に構真柱50を支持するための構真柱基礎51を構築するステップS2と、構真柱基礎51上に構真柱50を建て込むステップS3と、構真柱50で支持して1階床躯体34Aを構築するステップS4と、1階床躯体34Aの上側では、新築建物の地上躯体4を構築しつつ、1階床躯体34Aの下側では、既存地下躯体10を撤去して新築建物3の地下躯体30を構築するステップS5A、S5Bと、を備える。【選択図】図5
BUILDING RECONSTRUCTION METHOD
建物の建て替え方法
KIMURA HIROSHI (author) / FUJIYAMA JUNJI (author) / NONOYAMA MASAMINE (author) / HIROOKA KUNIMASA (author)
2023-02-21
Patent
Electronic Resource
Japanese
RECONSTRUCTION METHOD OF EXISTING BUILDING AND RECONSTRUCTION BUILDING