To provide a base-isolation method of an existing building which can prevent the settlement and shaking of the existing building, when removing part of an existing foundation and installing a base-isolation device.SOLUTION: A base-isolation method of an existing building includes: steps S1-S4 of installing a hydraulic jack 77 on a lower surface of a foundation beam 21 of an existing building 1, taking a reaction force to the foundation beam 21 by the hydraulic jack 77, and press-fitting a steel pipe pile 70 in the ground 2 immediately under the foundation beam 21; a step S5 of supporting the foundation beam 21 of the existing building 1 by the steel pipe pile 70, and connecting the steel pipe pile 70 and the foundation beam 21 with a connection material 73; steps S6-S8 of removing a footing 20 and constructing a lower part base-isolation foundation 40, and installing a base-isolation device 30 on the lower part base-isolation foundation 40; and steps S9, S10 of constructing an upper part base-isolation foundation 50 between the base-isolation device 30 and the foundation beam 21 of the existing building 1, and removing the connection material 73.SELECTED DRAWING: Figure 7
【課題】既存基礎の一部を撤去して免震装置を設置する際に、既存建物の沈下や揺れを防止できる、既存建物の免震化方法を提供すること。【解決手段】既存建物の免震化方法は、既存建物1の基礎梁21の下面に油圧ジャッキ77を設置して、油圧ジャッキ77で基礎梁21に反力をとって、基礎梁21の直下の地盤2内に鋼管杭70を圧入するステップS1~S4と、鋼管杭70で既存建物1の基礎梁21を支持するとともに、鋼管杭70と基礎梁21とを連結材73で連結するステップS5と、フーチング20を撤去して下部免震基礎40を構築し、下部免震基礎40の上に免震装置30を設置するステップS6~S8と、免震装置30と既存建物1の基礎梁21との間に上部免震基礎50を構築し、連結材73を撤去するステップS9、S10と、を含む。【選択図】図7
To provide a base-isolation method of an existing building which can prevent the settlement and shaking of the existing building, when removing part of an existing foundation and installing a base-isolation device.SOLUTION: A base-isolation method of an existing building includes: steps S1-S4 of installing a hydraulic jack 77 on a lower surface of a foundation beam 21 of an existing building 1, taking a reaction force to the foundation beam 21 by the hydraulic jack 77, and press-fitting a steel pipe pile 70 in the ground 2 immediately under the foundation beam 21; a step S5 of supporting the foundation beam 21 of the existing building 1 by the steel pipe pile 70, and connecting the steel pipe pile 70 and the foundation beam 21 with a connection material 73; steps S6-S8 of removing a footing 20 and constructing a lower part base-isolation foundation 40, and installing a base-isolation device 30 on the lower part base-isolation foundation 40; and steps S9, S10 of constructing an upper part base-isolation foundation 50 between the base-isolation device 30 and the foundation beam 21 of the existing building 1, and removing the connection material 73.SELECTED DRAWING: Figure 7
【課題】既存基礎の一部を撤去して免震装置を設置する際に、既存建物の沈下や揺れを防止できる、既存建物の免震化方法を提供すること。【解決手段】既存建物の免震化方法は、既存建物1の基礎梁21の下面に油圧ジャッキ77を設置して、油圧ジャッキ77で基礎梁21に反力をとって、基礎梁21の直下の地盤2内に鋼管杭70を圧入するステップS1~S4と、鋼管杭70で既存建物1の基礎梁21を支持するとともに、鋼管杭70と基礎梁21とを連結材73で連結するステップS5と、フーチング20を撤去して下部免震基礎40を構築し、下部免震基礎40の上に免震装置30を設置するステップS6~S8と、免震装置30と既存建物1の基礎梁21との間に上部免震基礎50を構築し、連結材73を撤去するステップS9、S10と、を含む。【選択図】図7
BASE-ISOLATION METHOD OF EXISTING BUILDING
既存建物の免震化方法
2023-06-05
Patent
Electronic Resource
Japanese
European Patent Office | 2017
|TEMPORARY STRUCTURE DURING BASE-ISOLATION WORK FOR EXISTING BUILDING
European Patent Office | 2015
|BASE-ISOLATION STRUCTURING METHOD OF EXISTING CONSTRUCTION
European Patent Office | 2015
|