A platform for research: civil engineering, architecture and urbanism
VARIABLE CROSS-SECTION PIPE GALLERY STRUCTURE SUITABLE FOR RAPID CONSTRUCTION AND CONSTRUCTION METHOD THEREFOR
The present invention relates to a pipe gallery cross-section structure suitable for rapid construction, comprising a top plate, side walls, and a bottom plate. A variable cross-section structure is used for the top plate of which the cross-section height changes gradually. The side walls are provided on two sides of the top plate. A chamfered portion is provided between the side wall and the flat bottom plate. A top mold attached to the top plate is provided below the top plate in the pipe gallery construction. A side mold attached to the side wall is provided below the top mold. A hinge structure is provided between the top mold and the side mold. The present invention also relates to a construction method for the pipe gallery cross-section structure suitable for rapid construction. According to the present invention, the structure of the variable cross-section top plate of which the cross-section height changes gradually can effectively eliminate the stress concentration phenomenon of the pipe gallery under the action of the top and lateral earth pressure and other external loads, and can also fully reduce the weight thereof, save materials, and exert the characteristics of structural force. Accordingly, a curved top mold matching the structure of the variable cross-section top plate is connected to the side mold by means of the hinge structure to form an integral steel inner membrane without bending angles, which is fully suitable for rapid construction of the pipe gallery.
La présente invention concerne une structure de section transversale de galerie de tuyaux appropriée pour une construction rapide, comprenant une plaque supérieure, des parois latérales et une plaque inférieure. Une structure de section transversale variable est utilisée pour la plaque supérieure dont la hauteur de section transversale change progressivement. Les parois latérales sont disposées sur deux côtés de la plaque supérieure. Une partie chanfreinée est disposée entre la paroi latérale et la plaque inférieure plate. Un moule supérieur fixé à la plaque supérieure est disposé au-dessous de la plaque supérieure dans la construction de galerie de tuyaux. Un moule latéral fixé à la paroi latérale est disposé au-dessous du moule supérieur. Une structure de charnière est disposée entre le moule supérieur et le moule latéral. La présente invention concerne également un procédé de construction pour la structure de section transversale de galerie de tuyaux appropriée pour une construction rapide. Selon la présente invention, la structure de la plaque supérieure de section transversale variable, dont la hauteur de section transversale change progressivement, peut éliminer efficacement le phénomène de concentration de contrainte de la galerie de tuyaux sous l'action de la pression terrestre supérieure et latérale et d'autres charges externes, et peut également réduire entièrement le poids de celle-ci, économiser des matériaux, et exercer les caractéristiques de force structurelle. En conséquence, un moule supérieur incurvé correspondant à la structure de la plaque supérieure de section transversale variable est relié au moule latéral au moyen de la structure de charnière pour former une membrane interne en acier intégrale sans angles de courbure, qui est parfaitement appropriée pour une construction rapide de la galerie de tuyaux.
本发明涉及一种适用于快速施工的管廊截面结构,包括顶板、侧墙和底板,所述顶板采用截面高度逐渐变化的变截面结构形式,侧墙设置于顶板两侧,侧墙与平直底板之间设置有倒角部,在管廊施工中顶板下方设置有与顶板贴合的顶模,在顶模下方设置有与侧墙贴合的侧模,在顶模和侧模之间设置有铰接结构;本发明还涉及一种适用于快速施工的管廊截面结构的施工方法。本发明截面高度逐渐变化的变截面顶板结构能有效消除管廊在顶部、侧向土压力和其他外荷载作用下发生的应力集中现象,还能充分减轻自重、节省材料并发挥结构受力特点;相应地,与变截面顶板结构相匹配的曲线顶模通过铰接结构与侧模相连,形成无折角的整体钢内膜,充分适用于管廊的快速施工。
VARIABLE CROSS-SECTION PIPE GALLERY STRUCTURE SUITABLE FOR RAPID CONSTRUCTION AND CONSTRUCTION METHOD THEREFOR
The present invention relates to a pipe gallery cross-section structure suitable for rapid construction, comprising a top plate, side walls, and a bottom plate. A variable cross-section structure is used for the top plate of which the cross-section height changes gradually. The side walls are provided on two sides of the top plate. A chamfered portion is provided between the side wall and the flat bottom plate. A top mold attached to the top plate is provided below the top plate in the pipe gallery construction. A side mold attached to the side wall is provided below the top mold. A hinge structure is provided between the top mold and the side mold. The present invention also relates to a construction method for the pipe gallery cross-section structure suitable for rapid construction. According to the present invention, the structure of the variable cross-section top plate of which the cross-section height changes gradually can effectively eliminate the stress concentration phenomenon of the pipe gallery under the action of the top and lateral earth pressure and other external loads, and can also fully reduce the weight thereof, save materials, and exert the characteristics of structural force. Accordingly, a curved top mold matching the structure of the variable cross-section top plate is connected to the side mold by means of the hinge structure to form an integral steel inner membrane without bending angles, which is fully suitable for rapid construction of the pipe gallery.
La présente invention concerne une structure de section transversale de galerie de tuyaux appropriée pour une construction rapide, comprenant une plaque supérieure, des parois latérales et une plaque inférieure. Une structure de section transversale variable est utilisée pour la plaque supérieure dont la hauteur de section transversale change progressivement. Les parois latérales sont disposées sur deux côtés de la plaque supérieure. Une partie chanfreinée est disposée entre la paroi latérale et la plaque inférieure plate. Un moule supérieur fixé à la plaque supérieure est disposé au-dessous de la plaque supérieure dans la construction de galerie de tuyaux. Un moule latéral fixé à la paroi latérale est disposé au-dessous du moule supérieur. Une structure de charnière est disposée entre le moule supérieur et le moule latéral. La présente invention concerne également un procédé de construction pour la structure de section transversale de galerie de tuyaux appropriée pour une construction rapide. Selon la présente invention, la structure de la plaque supérieure de section transversale variable, dont la hauteur de section transversale change progressivement, peut éliminer efficacement le phénomène de concentration de contrainte de la galerie de tuyaux sous l'action de la pression terrestre supérieure et latérale et d'autres charges externes, et peut également réduire entièrement le poids de celle-ci, économiser des matériaux, et exercer les caractéristiques de force structurelle. En conséquence, un moule supérieur incurvé correspondant à la structure de la plaque supérieure de section transversale variable est relié au moule latéral au moyen de la structure de charnière pour former une membrane interne en acier intégrale sans angles de courbure, qui est parfaitement appropriée pour une construction rapide de la galerie de tuyaux.
本发明涉及一种适用于快速施工的管廊截面结构,包括顶板、侧墙和底板,所述顶板采用截面高度逐渐变化的变截面结构形式,侧墙设置于顶板两侧,侧墙与平直底板之间设置有倒角部,在管廊施工中顶板下方设置有与顶板贴合的顶模,在顶模下方设置有与侧墙贴合的侧模,在顶模和侧模之间设置有铰接结构;本发明还涉及一种适用于快速施工的管廊截面结构的施工方法。本发明截面高度逐渐变化的变截面顶板结构能有效消除管廊在顶部、侧向土压力和其他外荷载作用下发生的应力集中现象,还能充分减轻自重、节省材料并发挥结构受力特点;相应地,与变截面顶板结构相匹配的曲线顶模通过铰接结构与侧模相连,形成无折角的整体钢内膜,充分适用于管廊的快速施工。
VARIABLE CROSS-SECTION PIPE GALLERY STRUCTURE SUITABLE FOR RAPID CONSTRUCTION AND CONSTRUCTION METHOD THEREFOR
STRUCTURE DE GALERIE DE TUYAUX À SECTION TRANSVERSALE VARIABLE APPROPRIÉE POUR UNE CONSTRUCTION RAPIDE ET SON PROCÉDÉ DE CONSTRUCTION
适用于快速施工的变截面管廊结构及其施工方法
WU QINGXIONG (author) / CHEN RONGGANG (author) / HU SHANHUA (author) / YANG YILUN (author) / CHEN HONGYI (author)
2020-12-10
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pipe gallery lining rapid pouring construction method suitable for narrow space
European Patent Office | 2024
|European Patent Office | 2024
|Construction method of comprehensive pipe gallery and long-section pipe gallery
European Patent Office | 2022
|Prefabricated combined joint suitable for rapid construction of small comprehensive pipe gallery
European Patent Office | 2023
|